Commercial Masonry

Structural Concrete Repair (Bedford Heights)

Process Overview:

The damaged structural concrete at the base of the wall was first assessed

  • All loose and delaminated concrete was chipped away to expose sound substrate.
  • The are was cleaned and prepared
  • Rebuilt with high-strenght plymer-modified mortar for superior bonding a durability.

Finishing Touches:

After the repair material cured, the surface was finished with a compatible EIFS texture.

  • Applied an eleastomeric coating to mathc the surrounding facade.
  • Provided long-term protection from moisture and UV exposure, restoring both structural integrity and aesthetic continuity.

Historic Marble Facade Rebuild (Mayfield Heights)

Challenges Adressed:

As a part of an ongoing maintenance effort, we adressed serious structural concerns with a 100 year old marble stone facade.

  • Water infiltration over decades had corroded the original steel anchor pins.
  • Temporary supports were placed to prevent further deterioration
  • The facade was rebuilt using stainless steel anchor pins for lasting drability and corrosion resistance